Construction of Potable Water Supply System (Level 3) at Zone 10 Barangay Tayabo, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 7 (Kamanggahan) Barangay Sto Nino 3rd, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 5 (Nilamuyak) Barangay Sto Nino 3rd, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 2 (Tinapahan) Barangay Sto Nino 3rd, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 1 Barangay San Juan, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 5 Barangay Pinili, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 2 Barangay Palestina, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 6 Barangay Malasin, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 3 Barangay Malasin, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) at Zone 4 Barangay Kaliwanagan, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Construction of Potable Water Supply System (Level 3) (Phase 2) at Zone 4, Barangay Bagong Sikat, San Jose City
Approved Budget for the Contract: Php 3,450,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2025
View in PhilGEPS →Invitation to Bid for the Purchase and Delivery of One (1) Unit Emergency Rescue Vehicle
Approved Budget for the Contract: Php 988,000.00
Delivery Schedule: 15 days
Source of Fund: Trust Fund
View in PhilGEPS →Invitation to Bid for the Procurement and Delivery of Various Common Medical Supplies for the 4th Quarter – Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 942,031.12
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
View in PhilGEPS →Invitation to Bid for the Purchase and Delivery of Emergency Text Blasting Machine
Approved Budget for the Contract: Php 4,500,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Installation of Street Lights along Palestina to Villa Joson, San Jose City, Nueva Ecija
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund Continuing Appropriations
Construction of Potable Water Supply System (Level 3) at Zone 5 (San Gaspar) Barangay Tondod, San Jose City, Nueva Ecija
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund Continuing Appropriations
Construction of Potable Water Supply System (Level 3) at Sitio Palasapas Barangay Manicla, San Jose City, Nueva Ecija
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 30 Days
Source of Fund: 20% Development Fund Continuing Appropriations
Construction of Slope Protection at Barangay Villa Joson, San Jose City, Nueva Ecija
Approved Budget for the Contract: Php 2,100,000.00
Contract Duration: 60 Days
Source of Fund: 5% LDRRMF
Construction of Slope Protection at City Public Market, San Jose City, Nueva Ecija
Approved Budget for the Contract: Php 1,200,000.00
Contract Duration: 60 Days
Source of Fund: 5% LDRRMF
Invitation to Bid for the Procurement and Delivery of Various Common Laboratory Supplies for the 3rd (Second Batch) and 4th Quarter Supplies - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 826,018.34
Contract Duration: 15 Days
Source of Fund: Trust Fund
Invitation to Bid for the Procurement and Delivery of Various Generic Drugs and Medicines for the 3rd Quarter Supplies - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,084,938.30
Contract Duration: 15 Days
Source of Fund: Trust Fund
Invitation to Bid for the Purchase and Delivery of One (1) Unit Water Finder
Approved Budget for the Contract: Php 1,000,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Procurement and Delivery of One (1) unit Drilling Machine
Approved Budget for the Contract: Php 2,000,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to to Bid for the Purchase and Delivery of 181 Liters of Deltamethrin
Approved Budget for the Contract: Php 995,500.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Procurement and Delivery of Various Laboratory Supplies for the 3rd Quarter - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 2,778,019.00
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
Invitation to Bid for the Procurement and Delivery of Various Common Medical Supplies for the 3rd Quarter - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,370,752.30
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
Invitation to Bid for the Purchase and Delivery of Various Musical Instruments
Approved Budget for the Contract: Php 1,000,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Purchase and Delivery of One (1) Unit Sports Utility Vehicle (4x2) for the use of office of the City Vice Mayor
Approved Budget for the Contract: Php 1,900,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Purchase and Delivery of Paint for Various Schools
Approved Budget for the Contract: Php 2,950,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Procurement and Delivery of Anti-Rabies Vaccine for the use of City Health Office
Approved Budget for the Contract: Php 999,600.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the for the Procurement and Delivery of Two (2) Units Water Truck
Approved Budget for the Contract: Php 5,700,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Construction of Youth Treatment Center at Barangay Sto Nino 1st, San Jose City
Approved Budget for the Contract: Php 15,000,000.00
Contract Duration: 240 days
Source of Fund: 20% Development Fund Continuing Appropriations
Construction of Rehabilitation Center at Barangay Sto Nino 1st, San Jose City
Approved Budget for the Contract: Php 15,000,000.00
Contract Duration: 240 days
Source of Fund: 20% Development Fund Continuing Appropriations
Invitation to Bid for the Purchase and Delivery of One (1) Unit Sports Utility Vehicle for the use of office of the City Vice Mayor
Approved Budget for the Contract: Php 1,900,000.00
Contract Duration: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement of Anti-Termite Treatment and Control of San Jose City Division Classrooms (School Building)
Approved Budget for the Contract: Php 2,000,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Rehabilitation of Bridge with Retaining Wall at Zone 1 Barangay San Juan
Approved Budget for the Contract: Php 3,000,000.00
Contract Duration: 90 Days
Source of Fund: 2024 - 20% Development Fund
Construction of Slope Protection at Tabulac High School Barangay Tabulac
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 60 Days
Source of Fund: Special Education Fund - Land Improvement
Concreting of Road at Zone 2 Barangay Sinipit Bubon
Approved Budget for the Contract: Php 2,300,000.00
Contract Duration: 60 Days
Source of Fund: Trust Fund - DILG SGLG 2022 Price
Invitation to Bid for the Purchase and Delivery of Three (3) Units Dump Truck for the use of Local Disaster Risk Reduction and Management Office (LDDRMO)
Approved Budget for the Contract: Php 5,505,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Procurement and Delivery of One (1) Unit Bulldozer for the use of Local Disaster Risk Reduction and Management Office (LDRRMO)
Approved Budget for the Contract: Php 8,500,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Procurement of One (1) Unit Backhoe for the use of Local Disaster Risk Reduction and Management Office (LDDRMO)
Approved Budget for the Contract: Php 7,500,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Procurement and Delivery of Various Laboratory Supplies
Approved Budget for the Contract: Php 1,186,620.00
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
Procurement and Delivery of Various Common Medical Supplies for the 2nd Quarter - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,108,404.48
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
Procurement and Delivery of Various Generic Drugs & Medicines
Approved Budget for the Contract: Php 1,004,461.36
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
Invitation to Bid for the Purchase and Delivery of One (1) Unit Patient Transport Vehicle and One (1) Unit Ambulance
Approved Budget for the Contract: Php 4,620,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Purchase and Delivery of Pay Loader for the use of LDRRMO
Approved Budget for the Contract: Php 4,200,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Purchase and Delivery of Five (5) Units RESCUE VEHICLE
Approved Budget for the Contract: Php 7,500,000.00
Contract Duration: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement of Foods/Meals For 2024 Central Luzon Regional Athletic Association (CLRAA) Meet
Approved Budget for the Contract: Php 1,977,800.00
Delivery Schedule:
Source of Fund: Special Education Fund
Construction of Drainage System at Government Center, Barangay Sto Nino 1st
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Drainage System at Panajon St, Barangay Calaocan
Approved Budget for the Contract: Php 3,000,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Rehabilitation of Drainage System at Ceferino Bascos - Romano St., Barangay R. Rueda Sr
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Invitation to Bid for the Procurement and Delivery of Various Office Supplies for the Second (2nd) and Third (3rd) Quarter
Approved Budget for the Contract: Php 6,827,495.00
Delivery Schedule: 30 Days
Source of Fund: General Fund
Invitation to Bid for the Hauling of The City’s Residual Wastes to a Sanitary Landfill
Approved Budget for the Contract: Php 13,120,000.00
Delivery Schedule: 1 Year
Source of Fund: General Fund
Rehabilitation of Box Culvert with Retaining Wall at Sitio Palasapas, Barangay Manicla
Approved Budget for the Contract: Php 3,500,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2024
Construction of Rip-Rap at Zone 5 - Zone 6, Barangay Culaylay
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Rehabilitation of Hanging Bridge at Barangay Tayabo
Approved Budget for the Contract: Php 3,500,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2024
Construction of Box Culvert with PCCP at (Back of Barangay Hall) Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Rehabilitation of Footbridge at Sitio Bangcag, Barangay Kita-Kita
Approved Budget for the Contract: Php 1,100,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Construction of Slope Protection at Barangay A. Pascual
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction/Rehabilition of Drainage System at Javalde St., Barangay Sibut
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 1 (Sitio Dela Cruz), Barangay Villa Marina
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Barangay Villa Joson
Approved Budget for the Contract: Php 2,000,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 4, Barangay Tondod
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 1, Barangay Tondod
Approved Budget for the Contract: Php 950,000.00
Contract Duration: 30 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 9, Barangay Sto Tomas
Approved Budget for the Contract: Php 3,750,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 1 (Quiambao Block), Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 4,000,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Feeder Road at Zone 5 (Side Streets), Barangay Sto Nino 2nd
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Feeder Road at Zone 3 (Antimano Farm), Barangay Sto Nino 2nd
Approved Budget for the Contract: Php 1,200,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 6 (Sitio Butao), Barangay Sto Nino 1st
Approved Budget for the Contract: Php 1,000,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 2, Barangay Pinili
Approved Budget for the Contract: Php 2,000,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 7, Barangay Culaylay
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 60 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Zone 4 (Sitio Cabatuan), Barangay Dizol
Approved Budget for the Contract: Php 4,000,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2024
Concreting of Road at Sitio Tanibong, Barangay Abar 1st
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2024
Fabrication and Installation of Solar Flood Light along Maharlika Road (Malasin to Tayabo)
Approved Budget for the Contract: Php 14,000,000.00
Contract Duration: 180 Days
Source of Fund: 20% Development Fund of 2024
Construction of Multi-Purpose Hall at BJMP Compound, Barangay Malasin
Approved Budget for the Contract: Php 2,000,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Stage and Expansion of Multi-Purpose Hall at Barangay Camanacsacan
Approved Budget for the Contract: Php 7,500,000.00
Contract Duration: 180 Days
Source of Fund: 20% Development Fund of 2024
Construction of Stage at Umali Multi-Purpose Hall Barangay Porais
Approved Budget for the Contract: Php 3,700,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Kaunlaran Multi-Purpose Hall at Julia St., Barangay Abar 1st
Approved Budget for the Contract: Php 6,750,000.00
Contract Duration: 180 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 5, Barangay Villa Joson
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 1, Barangay Tayabo
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 3, Barangay Sto Nino 2nd
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 6 (Sitio Delaen), Barangay Abar 2nd
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 6 (Kariskis), Barangay San Agustin
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 1A, Barangay San Agustin
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 2, Barangay Porais
Approved Budget for the Contract: Php 2,600,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 3 (Vicmudo), Barangay Pinili
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 1A, Barangay Dizol
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Construction of Potable Water Supply System (Level 3) at Zone 7 Sitio Kaunlaran, Barangay Caanawan
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2024
Invitation to Bid for the Purchase and Delivery of Emergency Rescue Vehicle
Approved Budget for the Contract: Php 988,000.00
Delivery Schedule: 15 Days
Source of Fund: Trust Fund
Invitation to Bid for the Supply and Delivery of Emergency Operation Center Full Functionality
Approved Budget for the Contract: Php 20,000,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement and Delivery of Various Generic Drugs & Medicines 4th Quarter Supplies-Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,223,529.08
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Procurement and Delivery of Various Laboratory Supplies for 4th Quarter - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,276,926.24
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Purchase and Delivery of Various Laboratory Equipment
Approved Budget for the Contract: Php 1,499,560.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Purchase and Delivery of Robotics Starter Kit
Approved Budget for the Contract: Php 1,500,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Purchase and Delivery of High-Volume Low-Speed Industrial (HVLS) Fan
Approved Budget for the Contract: Php 1,000,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Procurement and Delivery of Individual Learners Chair and Table
Approved Budget for the Contract: Php 5,670,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Procurement and Delivery of Various Laboratory/Technical Equipment
Approved Budget for the Contract: Php 834,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Invitation to Bid for the Procurement and Delivery of Various Grocery Items for the Day Care Year-End Festival 2023
Approved Budget for the Contract: Php 1,108,644.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Supply and Installation of Grid Tied Solar Energy System with Net Metering
Approved Budget for the Contract: Php 7,000,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Construction of Gateway at San Jose City National High School
Approved Budget for the Contract: Php 4,000,000.00
Contract Duration: 120 Days
Source of Fund: Special Education Fund
Improvement / Upgrading of Ground at Ciriaco Esteban Elementary School Barangay Sto Nino 1st
Approved Budget for the Contract: Php 2,000,000.00
Contract Duration: 90 Days
Source of Fund: Special Education Fund
Construction of Perimeter Fence at Batong Lusong Elementary School Barangay Villa Floresta
Approved Budget for the Contract: Php 2,680,000.00
Contract Duration:
Source of Fund: Special Education Fund
Construction of Drainage System at Cervantes St. Barangay Calaocan
Approved Budget for the Contract: Php 3,000,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Invitation to Bid for the Supply and Installation of Grid Tied Solar Energy System with Net Metering
Approved Budget for the Contract: Php 7,000,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Purchase and Delivery of Paint for the Repainting of Schools - Two failed biddings
Approved Budget for the Contract: Php 2,905,600.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Construction of Perimeter Fence at Tulat Elementary School Barangay Tulat, San Jose City
Approved Budget for the Contract: Php 1,200,000.00
Contract Duration: 90 Days
Source of Fund: Special Education Fund
Construction of Perimeter Fence at Pinili Elementary School Barangay Pinili, San Jose City
Approved Budget for the Contract: Php 1,230,000.00
Contract Duration: 90 Days
Source of Fund: Special Education Fund
Construction of Two (2) Storey Six (6) Classroom School Building at Encarnacion Elementary School Barangay Sto Nino 1st, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Special Education Fund
Construction of Grandstand at an Jose City National High School Barangay Calaocan, San Jose City
Approved Budget for the Contract: Php 12,000,000.00
Contract Duration: 180 Days
Source of Fund: Special Education Fund
Construction of Drainage System at San Jose City National High School Barangay Calaocan, San Jose City
Approved Budget for the Contract: Php 3,000,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Re-Blocking of San Jose - Tulat - Porais Road at Tulat Section Barangay Tulat, San Jose City
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2023
Invitation to Bid for the Supply and Delivery of Color Ultrasound System for the use of Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 2,000,000.00
Delivery Schedule: 15 days
Source of Fund: General Fund
Improvement of Office of the City Administrator at City Hall Building, Barangay Rafael Rueda, San Jose City
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 60 Days
Source of Fund: NON-OFFICE
Purchase and Delivery of Paint for the Repainting of Schools
Approved Budget for the Contract: Php 2,905,600.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Concreting of Road at Barangay Kita-Kita, San Jose City
Approved Budget for the Contract: Php 1,000,000.00
Contract Duration: 60 days
Source of Fund: 20% Development Fund of 2023
Construction of Kaunlaran Multi-Purpose Hall at Barangay Rafael Rueda Sr, San Jose City
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2023
Construction of Two (2) Storey Six (6) Classroom School Building at Ciriaco Esteban Elementary School, Barangay Sto. Nino 1st, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Special Education Fund
Construction of Two (2) Storey Six (6) Classroom School Building at Sto Nino 2nd Elementary School, Barangay Sto Nino 2nd, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Special Education Fund
Construction of Two (2) Storey Six (6) Classroom School Building at Sto Nino 2nd Elementary School, Barangay Sto Nino 2nd, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Special Education Fund
Construction of Two (2) Storey Six (6) Classroom School Building at Pinili Elementary School, Barangay Pinili, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Four (4) Classroom School Building at Tayabo Elementary School, Barangay Tayabo, San Jose City
Approved Budget for the Contract: Php 9,500,000.00
Contract Duration: 240 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Twelve (12) Classroom School Building at Abar 1st Elementary School, Barangay Abar 1st, San Jose City
Approved Budget for the Contract: Php 28,500,000.00
Contract Duration: 420 days
Source of Fund: Loan from LBP
Construction of Three (3) Storey Nine (9) Classroom School Building at Camanacsacan Elementary School, Barangay Camanacsacan, San Jose City
Approved Budget for the Contract: Php 20,212,500.00
Contract Duration: 420 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at San Jose West Central School, Barangay Canuto Ramos, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Tulat Elementary School, Barangay Tulat, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Tondod High School, Barangay Tondod, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at San Jose East Central School, Barangay Sibut, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at BLISS Elementary School, Barangay Malasin, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Purchase and Delivery of Paint for the Repainting of Schools
Approved Budget for the Contract: Php 2,905,600.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Construction of Two (2) Storey Six (6) Classroom School Building at Parilla Elementary School, Barangay Villa Joson, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Palasapas Elementary School, Barangay Manicla, San Jose City
Approved Budget for the Contract: Php 14,350,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Naglaoag Elementary School, Barangay Sto Nino 3rd, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at A. Pascual Elementary School, Barangay A. Pascual, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Tondod Elementary School, Barangay Tondod, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Palestina Elementary School, Barangay Palestina, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Palestina Agricultural High School, Barangay Palestina, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Tayabo High School, Barangay Tayabo, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Two (2) Storey Six (6) Classroom School Building at Bagong Sikat Integrated School, Barangay Bagong Sikat, San Jose City
Approved Budget for the Contract: Php 14,250,000.00
Contract Duration: 300 days
Source of Fund: Loan from LBP
Construction of Potable Water Supply System (Level 3) at Zone 1 Barangay Sto Nino 2nd
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Invitation to Bid for the Procurement and Delivery of Various Laboratory Supplies 3rd Quarter - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,869,710.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of Smart Television for Public School Classrooms
Approved Budget for the Contract: Php 7,650,000.00
Delivery Schedule: 15 Days
Source of Fund: Special Education Fund
Concreting of Road at Zone 2 (Esguerra-Sta Romana Road) Barangay Abar 1st
Approved Budget for the Contract: Php 3,500,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Construction of Potable Water Supply System (Level 3) at Zone 4 Barangay Kita-Kita
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Construction of Potable Water Supply System (Level 3) at Zone 3 Barangay Caanawan
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Construction of Potable Water Supply System (Level 3) at Zone 7 Barangay Pinili
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Invitation to Bid for the Procurement and Delivery of Various Drugs and Medicines 2nd Quarter Supplies - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,493,362.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Construction of Public Comfort Room at DA Compound Barangay Malasin
Approved Budget for the Contract: Php 1,700,000.00
Contract Duration: 90
Source of Fund: 20% Development Fund of 2023
Construction of Drainage System at Melcar Subdivision Barangay Calaocan
Approved Budget for the Contract: Php 4,829,920.00
Contract Duration: 150 Days
Source of Fund: 20% Development Fund of 2023
Concreting of Road (Gracious Sheperd) at Barangay Abar 1st
Approved Budget for the Contract: Php 1,800,000.00
Contract Duration: 90 Days
Source of Fund: 20% Development Fund of 2023
Concreting of Farm to Market Road (Phase 2) at Sitio Tanibong Barangay Abar 1st
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 120 Days
Source of Fund: 20% Development Fund of 2023
Purchase and Delivery 2400CC 4 CYL 16V Engine MT Motor Vehicle with FB Body
Approved Budget for the Contract: Php 1,200,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Construction of Slope Protection (Gabions) at Barangay Bagong Sikat
Approved Budget for the Contract: Php 2,300,000.00
Contract Duration: 90 Days
Source of Fund: LDRRMF 2023
Construction of Slope Protection (Gabions) along Sapang Tuntunin Barangay Porais
Approved Budget for the Contract: Php 3,700,000.00
Contract Duration: 120 Days
Source of Fund: LDRRMF 2023
Concreting of Road at Zone 2 (Sitio Paraiso) Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 7,000,000.00
Contract Duration: 120 Days
Source of Fund: Trust Fund DILG Region 3
INVITATION TO BID FOR THE PURCHASE AND DELIVERY OF 2400CC 4 CYL 16V ENGINE MT MOTOR VEHICLE WITH FB BODY
Approved Budget for the Contract: Php 1,200,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
INVITATION TO BID FOR THE PURCHASE AND DELIVERY OF FOUR (4) WHEEL TYPE VEHICLE
Approved Budget for the Contract: Php 777,700.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
INVITATION TO BID FOR THE PURCHASE AND DELIVERY OF PICK-UP TYPE VEHICLE (4x2)
Approved Budget for the Contract: Php 1,800,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement and Delivery of Various Office Supplies for the First Quarter
Approved Budget for the Contract: Php 4,888,034.00
Delivery Schedule: 30 Days
Source of Fund: General Fund
Invitation to Bid for the Purchase and Delivery of Nine Thousand Ninety (9,090) Bottles of Foliar Fertilizer
Approved Budget for the Contract: Php 4,999,500.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Trust Fund
Invitation to Bid for the Hauling of The City’s Residual Wastes to a Sanitary Landfill
Approved Budget for the Contract: Php 13,120,000.00
Delivery Schedule: 1 Year
Source of Fund: General Fund
Construction of Potable Water Supply System (Level 3) at Zone 1A Barangay Tulat
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 6 Barangay Sto. Nino 2nd
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 6 Barangay Caanawan
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Barangay Sinipit Bubon
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 1 Barangay Sto. Tomas
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 7A Barangay Sto. Tomas
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Sitio Dela Cruz Barangay Villa Marina
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Villa Lagunero Barangay A. Pascual
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 5 Barangay Sto. Tomas, San Jose City
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Sitio Caaringayan, Barangay Malasin
Approved Budget for the Contract: Php 2,990,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Potable Water System at DA Compound, Barangay Malasin, San Jose City
Approved Budget for the Contract: Php 1,790,000.00
Contract Duration: 60 Days
Source of Fund: 2023 - 20% Development Fund
Fabrication & Installation of Solar Flood Light Along Maharlika Highway (Sto. Tomas - Abar 1st)
Approved Budget for the Contract: Php 12,200,000.00
Contract Duration: 120 Days
Source of Fund: 2023 - 20% Development Fund
Fabrication and Installation Sun Buffle / Swimming Pool Shed at Tayabo Nature's Park
Approved Budget for the Contract: Php 3,100,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Construction of Drainage System (Phase 2) at Barangay Sibut
Approved Budget for the Contract: Php 1,825,000.00
Contract Duration: 90 Days
Source of Fund: 2023 - 20% Development Fund
Rehabilitation of Porais-Bagong Sikat Road (Phase 2) at Barangay Porais
Approved Budget for the Contract: Php 1,998,748.81
Contract Duration: 60 Days
Source of Fund: 2023 - 20% Development Fund
Invitation to Bid for the Purchase and Delivery of One (1) unit Pick-up
Approved Budget for the Contract: Php 1,500,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Purchase and Delivery of One (1) unit Pick-up
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Purchase and Delivery of One (1) unit Pick-up
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Purchase and Delivery of Fire Truck Engine and Chassis
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 15 Days
Source of Fund: LDRRM Trust Fund
Invitation to Bid for the Procurement and Delivery of Sports Utility Vehicle (4x2)
Approved Budget for the Contract: Php 2,000,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement and Delivery of Two (2) units Mobile Kitchen
Approved Budget for the Contract: Php 5,000,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Trust Fund
Invitation to Bid for the Procurement and Delivery of Four (4) units Rescue Patrol Vehicle
Approved Budget for the Contract: Php 6,000,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Trust Fund
Invitation to Bid for the Procurement and Delivery of Four (4) units Ambulance/Patient Transport Vehicle
Approved Budget for the Contract: Php 7,000,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Purchase and Delivery of Sports Utility Vehicle (4x4)
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 15 days
Source of Fund: General Fund
Rehabilitation of Senior HS Building at SJCNHS Barangay Calaocan
Approved Budget for the Contract: Php 2,500,000.00
Contract Duration: 90 Days
Source of Fund: SEF-School Buildings
Procurement and Delivery of of Various Grocery Items
Approved Budget for the Contract: Php 1,342,440.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of Various Drugs and Medicine 4th Quarter Supplies-Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,331,771.32
Delivery Schedule: 15 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement and Delivery of Various Utility Vehicles
Approved Budget for the Contract: Php 1,460,000.00
Delivery Schedule: 15 Days
Source of Fund: Building Official Trust Fund
Construction of Multi-Purpose Hall for Senior Citizen at Melcar Subd. Barangay Calaocan
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Multi-purpose Building at Barangay Crisanto Sanchez
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Invitation for Negotiated Procurement Two Failed Competitive Bidding for the Supply and Delivery of Patient Transport Vehicle
Approved Budget for the Contract: Php 1,920,000.00
Contract Duration: 15 days
Source of Fund: PhilHealth Trust Fund
Concreting of Road at Zone 5 Barangay Tondod
Approved Budget for the Contract: Php 980,000.00
Contract Duration: 30 days
Source of Fund: 2022 - 20% Development Fund
Procurement and Delivery of Various Laboratory Supplies 3rd Quarter - Ospital ng Lungsod ng San Jose (OLSJ)
Approved Budget for the Contract: Php 1,531,987.00
Delivery Schedule: 15 days
Source of Fund: General Fund
Purchase and Delivery of Two Thousand (2,000) Pieces of Wood and Steel Armchair
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 15 days
Source of Fund: Special Education Fund
Concreting of Road at Zone 4 Barangay Manicla
Approved Budget for the Contract: Php 1,135,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Drainage System at Barangay Sibut
Approved Budget for the Contract: Php 1,905,000.00
Contract Duration: 60 days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 2 (Villa Ramos - Tanibong Road) Barangay Abar 1st
Approved Budget for the Contract: Php 4,146,927.28
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Procurement of Ten (10) units Sports Utility Vehicle
Approved Budget for the Contract: Php 17,000,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of Deltamethrin
Approved Budget for the Contract: Php 995,500.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Construction of Two (2) Storey Six (6) Classroom School Building at Malasin Elementary School
Approved Budget for the Contract: Php 12,000,000.00
Contract Duration: 180 Days
Source of Fund: General Fund
Invitation to Bid for the Procurement and Delivery of Life Detector Kit
Approved Budget for the Contract: Php 1,700,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Invitation to Bid for the Procurement and Delivery of Various Agricultural Machines
Approved Budget for the Contract: Php 921,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of Disaster Response and Rescue Equipment
Approved Budget for the Contract: Php 1,100,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of Various Agricultural Machines
Approved Budget for the Contract: Php 921,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Hauling of the City's Residual Wastes To A Sanitary Landfill
Approved Budget for the Contract: Php 12,000,000.00
Delivery Schedule: 1 Year
Source of Fund: General Fund
Procurement and Delivery of Two(2) units Sports Utility Vehicle and One (1) Asian Utility Vehicle
Approved Budget for the Contract: Php 4,900,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of One (1) unit Sports Utility Vehicle
Approved Budget for the Contract: Php 1,700,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Installation of Database Server Tower/Rockmount
Approved Budget for the Contract: Php 827,650.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of One (1) unit Rescue Ambulance
Approved Budget for the Contract: Php 2,200,000.00
Delivery Schedule: 15 Days
Source of Fund: LDRRM Fund
Procurement and Delivery of Fifty Thousand (50,000) packs of Hotdog for relief distribution
Approved Budget for the Contract: Php 9,000,000.00
Delivery Schedule: 15 Days
Source of Fund: General Fund
Procurement and Delivery of Various Drugs and Medicines 1st Quarter Supplies - Ospital ng Lungsod ng San Jose
Approved Budget for the Contract: Php 798,082.90
Delivery Schedule: 15 Days
Source of Fund: General Fund
Construction of 2-Storey 6 Classroom School Building at Tabulac High School Barangay Tabulac
Approved Budget for the Contract: Php 11,540,000.00
Contract Duration: 180 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Perimeter Fence with Vehicular Gates (Proposed Colegio de San Jose) at Barangay Sto Tomas
Approved Budget for the Contract: Php 14,150,000.00
Contract Duration: 180 Days
Source of Fund: General Fund
Construction of 2-Storey 9 Classroom Tertiary School Building (Proposed Colegio de San Jose) at Barangay Sto Tomas
Approved Budget for the Contract: Php 17,300,000.00
Contract Duration: 270 Days
Source of Fund: General Fund
Construction of 2-Storey 6 Classroom School Building at Sto Nino 3rd High School BarangaySto Nino 3rd
Approved Budget for the Contract: Php 11,540,000.00
Contract Duration: 180 Days
Source of Fund: General Fund
Construction of 2-Storey 4 Classroom School Building at Saranay Elementary School BarangaySto Nino 3rd
Approved Budget for the Contract: Php 8,500,000.00
Contract Duration: 150 Days
Source of Fund: General Fund
Construction of 2-Storey 6 Classroom School Building at San Agustin Integrated School Barangay San Agustin
Approved Budget for the Contract: Php 11,540,000.00
Contract Duration: 180 Days
Source of Fund: General Fund
Construction of 2-Storey 6 Classroom School Building at Kaliwanagan High School BarangayKaliwanagan
Approved Budget for the Contract: Php 11,540,000.00
Contract Duration: 180 Days
Source of Fund: General Fund
Construction of 2-Storey 6 Classroom School Building at Sampugo Elementary School Barangay Kita-Kita
Approved Budget for the Contract: Php 11,540,000.00
Contract Duration: 180 Days
Source of Fund: General Fund
Construction of 3-Storey 9 Classroom School Building at Kita-Kita High School Barangay Kita-Kita
Approved Budget for the Contract: Php 17,300,000.00
Contract Duration: 270 days
Source of Fund: General Fund
Construction of Multi-Purpose Hall at Barangay Culaylay
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Perimeter Fence at Villa Floresta E/S Barangay Villa Floresta
Approved Budget for the Contract: Php 2,380,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Multi-Purpose Hall at Sitio Batong Lusong Barangay Villa Floresta
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 3 Barangay Parang Mangga
Approved Budget for the Contract: Php 1,212,396.07
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Feeder Roads at Barangay Sto Nino 2nd
Approved Budget for the Contract: Php 2,365,167.50
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Multi-Purpose Hall at Barangay Sibut
Approved Budget for the Contract: Php 3,200,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 11B Barangay Sibut
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 6 Barangay Villa Joson
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of KAUNLARAN Multi-Purpose Hall at Centro Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 8,000,000.00
Contract Duration: 180 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Farm to Market Road with Slope Protection and RCP at Tanibong Road BarangayCalaocan
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 150 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 4B Barangay Caanawan
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Day Care Center at Sitio Panlasian Barangay Abar 2nd
Approved Budget for the Contract: Php 2,240,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 4 Barangay Tayabo
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 12 Barangay Tayabo
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 1 Barangay Tondod
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Perimeter Fence at Tabulac H/S Barangay Tabulac
Approved Budget for the Contract: Php 2,700,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Sitio Lomboy Barangay Tayabo
Approved Budget for the Contract: Php 4,000,000.00
Contract Duration: 200 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 10 Barangay Tayabo
Approved Budget for the Contract: Php 4,200,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Improvement of Tayabo Nature's Park (Phase III)
Approved Budget for the Contract: Php 13,201,424.00
Contract Duration: 180 Days
Source of Fund: Local Government Support Fund - Assistance to Cities FY 2020
Construction of Potable Water Supply System (Level 3) at Zone 7 Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Perimeter Fence and Drainage System at PNP Station Barangay Sto Nino 1st
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 2 Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 1 Barangay Tabulac
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Columbarium at Don Canuto Public Cemetery Barangay Sto Nino 1st
Approved Budget for the Contract: Php 2,000,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Improvement of Driver's Lounge at City Terminal Barangay Sto Nino 1st
Approved Budget for the Contract: Php 1,400,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 6 Barangay San Juan
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 9 Barangay Kita-Kita
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 1&2 Barangay Tabulac
Approved Budget for the Contract: Php 1,468,357.47
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Sitio Tanibong Barangay Abar 1st
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 1 Barangay Kaliwanagan
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Installation of Fire Protection System at Ospital ng Lungsod ng San Jose
Approved Budget for the Contract: Php 3,250,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 1 Barangay Pinili
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Multi-Purpose Building at Barangay Tayabo
Approved Budget for the Contract: Php 5,600,000.00
Contract Duration: 150 Days
Source of Fund: 2022 - 20% Development Fund
Procurement and Delivery of Food Relief Packs
Approved Budget for the Contract: Php 5,600,000.00
Delivery Schedule: 15 Days
Source of Fund: 20% Development Fund
Construction of Day Care Center at Old PAG-ASA Zone 3 Barangay Sto Nino 1st
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Concreting of Road at Zone 9-10 Barangay Kita-Kita
Approved Budget for the Contract: Php 4,250,408.88
Contract Duration: 120 Days
Source of Fund: 2022 - 20% Development Fund
Rehabilitation of Camanacsacan - Sto Tomas Diversion Road
Approved Budget for the Contract: Php 7,000,000.00
Contract Duration: 150 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 2 Barangay Parang Mangga
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Potable Water Supply System (Level 3) at Zone 1A Barangay Caanawan
Approved Budget for the Contract: Php 2,800,000.00
Contract Duration: 90 Days
Source of Fund: 2022 - 20% Development Fund
Construction of Slope Protection (Phase 2) at Barangay Villa Joson
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 120 Days
Source of Fund: LDRRMF 2021
Construction of Stone Masonry Slope Protection at Zone 4 Barangay Culaylay
Approved Budget for the Contract: Php 1,500,000.00
Contract Duration: 120 Days
Source of Fund: LDRRMF 2021
Rehabilitation of Road at Sitio Saranay Barangay Sto Nino 3rd
Approved Budget for the Contract: Php 5,000,000.00
Contract Duration: 120 Days
Source of Fund: General Fund